No.,Financial and Activity Report (sheet 2 of 2), ,Major Completed Actions (short bulleted list of the major actions taken in the last week),Major Planned Actions (short bulleted list of the major planned actions in the last week) 1,CBP:,CBP: 2,- No major completed actions to report this week.,- No major planned actions to report this week. 3,"- CBP had outlays of approximately $427,000 for port modernization activities during the week of 7/25/2011.","- 1) CBP restored funding modification for signage, K4 bollards, hazmat abatement, and site grading at various CBP-owned LPOE modernization projects is in progress. The modification in the amount of approximately $1.1 million is anticipated to be obligated as early as the week of 8/8/2011. 2) Border Security Deployment Program (BSDP) restored funding modification is in progress. The modification in the amount of approximately $21,000 is anticipated to be obligated as early as the week of 8/8/2011." 4,"- Tactical Communications: - (1) CBP had outlays of approximately $1.7 million for tactical communications during the week of 7/25/2011. (2) Houlton system staging began during the week of 7/25/2011. Non-Intrusive Inspection (NII): - CBP had outlays of approximately $640,000 for non-intrusive inspection equipment during the week of 7/25/2011.",- Tactical Communications: - No major planned actions to report this week. Non-Intrusive Inspection (NII): - No major planned actions to report this week. 5,"DHS MGMT - No changes in obligations or outlays. ARRA funds retained by DHS for execution have been fully expended. The USCG Headquarters construction operations continue with 3,500 cubic yards of concrete placed (CY) for a total of 124,500 CY placed to date. Brick work is proceeding on Building 1 with some areas completed and being washed down. Roofing installation continues on Building 1. Window and curtain wall installation is ongoing in Buildings 1 and 2. Vertical construction continues and permanent power/lighting construction started in Garages 1 and 2. Vertical construction for the central utility plant and the structure of the DOC A Block is underway. On the Phase 1B Renovation of 6 historic buildings for Adaptive Reuse, the contractor continued replacing second story, rotted, wood window lintels with steel replacements, cast the basement floor slab, and completed East & West tunnel abatements in preparation for their capping off on Building 31 (Credit Union/Coast Guard Historian). Building 33/34 (Dining Hall/Kitchen) - Started installation of first floor steel bracing and completed second floor steel bracing to support the building when second story floor is demolished.",DHS MGMT - The GSA Federal Acquisition Service (FAS) HQ Consolidation Outfitting Procurement and S1 Efficiency Initiative is on schedule for FY2011 fourth quarter award. Responses to the request for Proposal (RFP) for the DHS Operations Centers (DOC) Block A interior fit-out procurement were extended by GSA until August 3rd to allow sufficient time for technical amendment to be incorporated into the response. The procurement remains on track for fourth quarter award by GSA Public Buildings Service National Capital Region. 6,"ICE - Atlas Tactical Communications Project 25 (P25) Regions 2 and 3 contractor held a project status review on July 27, 2011",ICE: 7,,- Atlas Tactical Communications Region 3 P25 Upgrade contractor plans to conduct a Critical Design Review in early August (date not confirmed yet pending completion of site surveys). 8,,- Atlas Tactical Communications Region 2 P25 upgrade contractor continues to submit leasing packages for propsed tower site locations. 9,TSA - TSA’s outlays increased by approximately $1.8M due to the following changes: a checked baggage inspection system (CBIS) design OTA at MCO-Disney airport ($62.1K); CBIS construction OTAs with MCO-Disney ($317.5K) and PIE ($85.5K) airports; an advanced surveillance system OTA with LIT airport ($55.4K); and technology contracts for Explosives Trace Detection units ($1.2M) and Advanced Imaging Technology units ($35.1K).,TSA - none 10,USCG:,USCG - none 11,"- Re-obligated $36,448.21for High Endurance Cutter Automatic Bus Transfer (ABT) Switch installation contract in anticipation of antecedent liability claim to match the composite labor rate values to the contractually agreed labor rate. Contract is being prepared for close-out.", 12,"- Re-obligation of $36,448.21 for High Endurance Cutter Automatic Bus Transfer (ABT) Switch installation contract corrects erroneous de-obligation of like amount reported last week. Contract close-out continues.",