WEBVTT 1 00:00:00.000 --> 00:00:05.000 [Music] 2 00:00:06.160 --> 00:00:11.160 Narrator: Have you ever thought about what it would be like to lose power... 3 00:00:12.170 --> 00:00:17.170 not for a couple hours but for several months? How would you survive? 4 00:00:18.300 --> 00:00:23.300 Where would you get your daily water or food? How would you communicate? 5 00:00:24.300 --> 00:00:29.300 So many aspects of our daily lives depend on electricity. It affects our economy, 6 00:00:30.540 --> 00:00:35.540 and national security. The electric grid is one of the critical infrastructures 7 00:00:36.590 --> 00:00:39.900 identified by Homeland Security Presidential Directive 7. 8 00:00:39.900 --> 00:00:43.090 Sarah Mahmood: It's tied to our national economy. About 60% of our GDP 9 00:00:43.090 --> 00:00:48.090 is directly tied to electric power. And so a long sustained outage affects 10 00:00:48.100 --> 00:00:51.300 our national economy as well as, of course national security. 11 00:00:51.300 --> 00:00:56.300 Narrator: The 2003 Blackout...most power restored in 48 hours, 12 00:00:56.320 --> 00:01:01.320 estimated 10 billion in economic losses. Annual power outages... 13 00:01:02.470 --> 00:01:07.470 economic loesses, 100 billion. Several other critical infrastructures, 14 00:01:09.600 --> 00:01:14.600 such as transportation, communications and water, have direct ties to the electric grid, 15 00:01:15.910 --> 00:01:20.910 and depend on the grid in order to provide their services. A long term power outage 16 00:01:21.000 --> 00:01:26.000 has the potential to be catastrophic. Such an outage can be caused by manmade physical 17 00:01:26.180 --> 00:01:31.180 attacks, cyber attacks, or natural disasters, such as solar storms. 18 00:01:32.200 --> 00:01:36.220 The transmission grid in the United States is currently the largest in the word 19 00:01:36.220 --> 00:01:40.220 with over 80 thousand miles of extra high voltage transmission lines. 20 00:01:40.220 --> 00:01:44.230 The transmission grid is a long haul delivery system used to transport 21 00:01:44.230 --> 00:01:48.240 power from the generation stations, to the distribution network. 22 00:01:48.240 --> 00:01:52.260 EHV transformers are critical components of the transmission grid. 23 00:01:52.260 --> 00:01:56.280 Transforming voltage from one level to another, for transport along 24 00:01:56.280 --> 00:02:01.280 the transmission grid. Without them the grid can't function. These transformers 25 00:02:01.430 --> 00:02:06.430 are subject to a number of vulnerabilities. They are extremely large, making 26 00:02:06.720 --> 00:02:11.720 transportation a challange; they have long lead times, and other procurement challanges, 27 00:02:12.160 --> 00:02:17.160 sometimes with a 12 to 24 month delay; and they can take several weeks, or even months 28 00:02:17.220 --> 00:02:22.220 to transport and install. The recovery transformer is a solution that 29 00:02:22.320 --> 00:02:25.380 is prover to reduce recovery time by more than 75 percent, from several months, 30 00:02:25.380 --> 00:02:28.410 percent, from several months, to less than one week. 31 00:02:28.410 --> 00:02:31.630 Rich Lordan: Transformer is designed to meet industry standards. 32 00:02:31.630 --> 00:02:36.630 We designed this based on traditional transformer technology, 33 00:02:36.670 --> 00:02:39.910 so this transformer the Recovery Transformer is gonna last 30 yeas and is gonna 34 00:02:39.910 --> 00:02:44.910 provide reliable service. The key to it is the modularity, is the taking a 35 00:02:46.040 --> 00:02:50.190 three-phase transformer, turning into three single-phase transformer transformers 36 00:02:50.190 --> 00:02:53.270 and then taking all of the components off of that transformer and making it 37 00:02:53.270 --> 00:02:53.360 it modular; that's how we get the weight down. 38 00:02:53.360 --> 00:02:57.440 Craig Stiegemeier: From the ground up, it's designed to be highly 39 00:02:57.440 --> 00:03:02.440 transportable AND fast to install. Each box behind me does 200 40 00:03:03.680 --> 00:03:08.680 MVA, thats 200 million watts. That's roughly about one-fifth or one-six 41 00:03:08.720 --> 00:03:12.760 the size of a nuclear reactor, a big nuclear power plant. 42 00:03:12.760 --> 00:03:16.110 Narrator: To prove the Recovery Transformer concept, the team conducted a pilot 43 00:03:16.110 --> 00:03:21.110 demonstration that included the transportation, installation, assembly, 44 00:03:22.350 --> 00:03:26.620 commissioning, and energization of the transformer in less than one week. 45 00:03:26.620 --> 00:03:30.860 The exercise of begins with the ancillary equipment such as the turrets, bushings 46 00:03:30.860 --> 00:03:35.090 and control cabinets, floated onto the flatbed trailers beginning the journey to 47 00:03:35.090 --> 00:03:39.290 the site right away. This allows the utility crew on the receiving end to 48 00:03:39.290 --> 00:03:43.580 pre-position and test equipment before the transformers arrive. 49 00:03:43.580 --> 00:03:48.580 In the meantime, the transformers, which are stored full of oil, 50 00:03:48.620 --> 00:03:53.620 are drained. The COPS tanks are removed and secured to a trailer containing the 51 00:03:53.710 --> 00:03:58.710 cooling equipment. And the transformers are secured to lowboy trailers. 52 00:03:58.950 --> 00:04:02.220 The transformers drive on the route provided by the state permitting agencies 53 00:04:02.220 --> 00:04:06.550 with their escorts. At the substation, the ancillary equipment has 54 00:04:06.550 --> 00:04:10.840 already arrived, been tested and pre-positioned by the utility crew. 55 00:04:10.840 --> 00:04:15.170 Once the transformers arrive, the first two units are positions by a crane. 56 00:04:15.170 --> 00:04:19.480 The team also tested a unique design for easy transport on the third unit, 57 00:04:19.480 --> 00:04:24.480 known as the MA-65. This allows the transformer to be transported on a sled, 58 00:04:24.510 --> 00:04:29.510 which the trailer can attach to either side of, for transport and detach after positioning 59 00:04:29.610 --> 00:04:34.610 in the correct location. The sled also acts as a foundation for the transformer. 60 00:04:34.770 --> 00:04:38.920 Jack Heintschel: We set two of the units using a 200-ton crane. the units by the way, 61 00:04:38.920 --> 00:04:43.280 weigh about 125 thousand pounds apiece. We used a crane 62 00:04:43.280 --> 00:04:47.600 to set two of the units, but the third unit, we used a specially 63 00:04:47.600 --> 00:04:52.600 designed trailer that resembles-for those of you who are familiar with 64 00:04:52.630 --> 00:04:57.630 a Schnabel car, rail car, it resembles a Schnabel car but used over the road as 65 00:04:58.790 --> 00:05:01.940 opposed to over the rail. 66 00:05:01.940 --> 00:05:05.000 Narrator: Once the transformers are positioned, crews begin the assembly process 67 00:05:05.000 --> 00:05:08.330 which includes connecting bushings control cabinets, lightning arrestors, 68 00:05:08.330 --> 00:05:13.330 and more. The oil service takes once key elements of the transformer 69 00:05:13.470 --> 00:05:16.490 have been assembled. 70 00:05:16.490 --> 00:05:19.740 KC Jones: Processing on THESE units have been condensed somewhat, 71 00:05:19.740 --> 00:05:22.920 because of the nature of the units, compared to a traditional 72 00:05:22.920 --> 00:05:27.920 auto, we're able to oil-service these units and basically, a little under a day, 73 00:05:31.110 --> 00:05:36.110 say, two days, just rounding it off with our set time, where a traditional auto 74 00:05:37.120 --> 00:05:42.120 transformer can take as much as three weeks to oil service. 75 00:05:43.380 --> 00:05:47.690 Narrator: Crew then conducts final testing of the equipment, controls, 76 00:05:47.690 --> 00:05:52.150 and protection systems, before energizing the units before by closing the switches. 77 00:05:52.150 --> 00:05:56.160 The end result is the beautiful hum we hear when the units come online and 78 00:05:56.160 --> 00:06:00.470 begin carrying loads to customers. The exercise was completed in six days, 79 00:06:00.470 --> 00:06:04.490 a record time for installing such a transformer. The Recovery Transformer 80 00:06:04.490 --> 00:06:08.510 has the potential to significantly minimize the effects of long-term outage on our 81 00:06:08.510 --> 00:06:13.510 grid, strengthening America's security and resiliency.