P25 CAP program information in effect for equipment tested to 2010 CABs.

Baseline Common Air Interface Testing Requirements (March 2010) — One CAB applies to P25 Subscriber Equipment, Repeater, and Base and Fixed Station products.

Inter-RF Subsystem Interface Testing Requirements (March 2010) — One CAB applies to P25 Inter-RF Subsystem products.

P25 CAP Testing Requirements (March 2010) — Provides the requirements for the P25 CAP, including an overview of the P25 interfaces that are currently covered by the P25 CAP, and when the applicable SDOC documents and Summary Test Reports are required to accommodate the most current CABs.

Summary Test Report Requirements (STR) (September 2009) — Identifies uniform format requirements for use in preparation of STR documents. These documents are submitted to DHS for review and approval. Once approved, Summary Test Reports can be viewed publicly with their associated SDOC documents at the P25 CAP Grant-Eligible Equipment page of this site.

Supplier's Declaration of Compliance Requirements (SDOC) (September 2009) —  Identifies uniform format requirements for use in preparation of SDOC documents. These documents are submitted to DHS for review and approval. Once approved, SDOC documents can be viewed publicly with their associated STR documents at the P25 CAP Grant-Eligible Equipment page of this site.

NIST Handbook (June 2009) — Describes the process for attaining recognition as a P25 CAP laboratory.